Use this when the first question is tank size, not total project cost.
You will get a likely minimum, a conservative recommendation range, and a rough maintenance cadence that stays honest when usage is uncertain.
Use this page when the first question is tank size, not total project cost. It turns bedrooms, occupancy, disposal use, and state-specific sizing signals into a likely minimum, a conservative range, and a rough pumping cadence.
You will get a likely minimum, a conservative recommendation range, and a rough maintenance cadence that stays honest when usage is uncertain.
New York State Department of Health
New York's Appendix 75-A applies to residential onsite systems serving properties under 1,000 gallons per day, and new construction is based on a minimum daily flow of 110 gallons per bedroom. Specific waivers can be issued by the State Commissioner of Health or a designated city, county, or part-county health department official, so local health records still matter.
No direct public statewide garbage-disposal tank multiplier has been verified in the current New York source set.
New York has a real statewide standard, but the homeowner outcome can still change once county health files, site conditions, and any waiver history are surfaced.
Less than 1,000 gallons per day
New York's Appendix 75-A applies to residential onsite wastewater treatment systems serving properties under 1,000 gallons per day.
Source: Appendix 75-A - Wastewater Treatment Standards - Residential Onsite Systems | Appendix 75-A applicability
110 gallons per bedroom per day
New York's Appendix 75-A says new construction is based on a minimum daily flow of 110 gallons per bedroom.
Source: Appendix 75-A - Wastewater Treatment Standards - Residential Onsite Systems | New construction design flow
State or designated local health official
Appendix 75-A allows specific waivers to be issued by the State Commissioner of Health or a designated city county or part-county health department official.
Source: Appendix 75-A - Wastewater Treatment Standards - Residential Onsite Systems | Specific waivers
District office or county health department
New York publishes a field-office and local-health-department directory because homeowners still need the right district office or county health department on the file.
Source: NYSDOH Field Offices and Local Health Departments | Field offices and local health departments
The state guide explains the permit path, local verification links, records to request, and the reasons the final quote can move above the low end.
Most public rules start with bedrooms or bedroom-based design flow, which is why this tool treats them as the first sizing signal.
When household use is obviously heavier than bedroom count alone suggests, the conservative range moves up instead of pretending the lower end is still safe.
Garbage disposals and additional kitchens or ADUs raise the planning load and can justify a bigger homeowner-facing recommendation.
Even a strong tank-size estimate is not permit approval. Final sizing still depends on local review, site conditions, and the actual system path.
These state links are useful when you want a quick starting point before opening the full cost estimator or the state guide.
Use it as a planning tool to estimate a likely minimum tank size and a conservative range before you collect quotes or rely on old paperwork.
In many states, bedrooms or design flow are the main public sizing signal. Occupancy still helps widen the planning range when usage is clearly higher than the bedroom count suggests.
Sometimes yes. Some states call this out directly, and even where the rule is less explicit, disposal use is a reasonable homeowner-facing signal that the conservative range may need to move up.
Usually not. Seasonal use may soften the pumping cadence estimate, but it should not aggressively shrink a homeowner-facing size recommendation.
Use this estimator when you mainly want to know the likely tank band and whether disposal use, occupancy, or extra kitchens should widen it before you talk to installers.
Move to the full cost estimator when you need system-class risk, replacement planning, permit-path context, or a broader quote conversation.